
|
Section |
Topic |
|
12.1 |
Introduction |
|
12.2 |
Comfort conditions |
|
12.3 |
Room usage, ventilation and temperature levels |
|
12.4 |
Determining heat losses |
|
12.5 |
Heat emitters |
|
12.6 |
Heating system piping layouts |
|
12.7 |
Mass flow rate - provisional tube sizes |
|
12.8 |
Pump head, capacity, position and system balancing |
|
12.9 |
Provision for expansion of the system water |
|
12.10 |
Heating system control |
|
12.11 |
Types of control and their uses |
|
12.12 |
Heating control system types |
|
12.13 |
Upgrading existing heating control systems |
|
12.14 |
Cabling and wiring schematic diagrams |
|
12.15 |
Building regulations requirements |
|
12.16 |
Boiler selection criteria |
|
12.17 |
CHeSS, Energy Efficiency Recommended, SAP and SEDBUK |
|
12.18 |
System commissioning and handover |
|
12.19 |
Problems in heating systems |
|
12.20 |
Bibliography and further reading |
|
12.21 |
Summary multiple-choice questions |